Logo
  • Clients
  • About
  • Gallery
  • Contact
  • Home
  • Nature Reserve Management
  • Management plans
  • Access improvements and signage
  • Protected species
  • Nature areas, allotments, parks and schools
Photographs showing various aspects of our work from everyday maintenance tasks to more specialised conservancy and landscaping work. All the photos are of work which has been carried out by CEL.

Footpaths and signs

Return to gallery main page.
Pedestrian bridge before replacement
Pedestrian bridge after replacement
Track before re-surfacing
Track after re-surfacing
Using a powered wheelbarrow
Woodland boardwalk
Self-binding gravel
Woodland steps
Using a flatplate
Wheelchair ramp
Greenchain Walk street sign
Greenchain Walk street sign
Denham Lock Wood boardwalk
Nature reserve information board
Footpath construction
Heritage footpath sign
Footpath way marker
 
Tree

All CEL staff are committed to follow the IEEM code of professional conduct.
© All photography on this site Alan Scott, Complete Ecology Ltd.                                                                                 Company Registration No. 29047647. Registered Office 91 Church Road, Crystal Palace, London SE19 5LP.
Privacy Statement / Standards